How Many Days After Asphalt Driveway Cure

Asphalt pavements are a common sight in many neighborhoods across the country. They are durable and long-lasting, but they do require some maintenance. One of the essential things to do for your asphalt driveway is properly curing it. Curing is the process of hardening and setting the asphalt to withstand traffic and weathering.

 

Ways to Cure New Asphalt Driveway

The curing process for your asphalt driveway is crucial. There are two different ways to cure asphalt:

The first way is to let the driveway cure on its own. There is a six-month cooling-off period, but it will ensure that the driveway is hard and durable.

The second way is to use a sealer. It will speed up the process and allow you to use the driveway within a few days.


Asphalt Driveway Curing Process

The asphalt takes approximately 30 days to complete the drying process. However, it is best to wait at least 90 days before driving on it or parking a vehicle on it. It will give the driveway time to harden, settle properly and fully cure.

However, it is important to note that the curing process takes time, and you should be patient. Depending on the method you choose for curing your asphalt driveway, the process could take up to six months to complete. But in the end, it will be worth it to have a durable and long-lasting.

 

Factors That Affect Asphalt Driveway Curing Process

Among the most frequent inquiries is how many days after asphalt driveway cure? The answer depends on several factors, including air temperature, humidity, and thickness of the asphalt layer.

 

Air Temperature

One of the key factors in the curing process is air temperature. Paving jobs are frequently scheduled for the summer months when temperatures peak since asphalt cures fastest in a warm environment. Despite this, asphalt can be placed and will adequately cure in temperatures as low as 50 degrees Fahrenheit.

A temperature range of 80 to 85 degrees Fahrenheit is suitable for paving and curing asphalt. The asphalt is warmed by these electric blankets, accelerating the curing process. Ask your contractor about using curing blankets if you have an asphalt pavement project planned for the cooler months.

 

Humidity

Asphalt paving projects shouldn’t be scheduled when rain is expected because moisture can delay the asphalt curing process. High humidity levels can also be problematic.

The asphalt may only adequately connect with the foundation layer if the air is humid enough. Weaker pavement, as a result, may be more prone to cracking and potholes. The ideal relative humidity for paving and curing asphalt is between 30 and 40 percent.

 

Thickness

The asphalt layer’s thickness affects how quickly it cures. A coating of asphalt that is thicker will take longer to cure than one that is thinner. Most residential asphalt driveway projects require a two to four-inch thick asphalt layer. A two-inch thick asphalt layer typically cures between 24 and 48 hours. It will take roughly twice as long for a four-inch thick layer to cure. 

 

Asphalt Curing Process Time

After being applied, asphalt continues to cure for up to two years. However, the first six months of the asphalt curing process is when it happens the most. The asphalt hardens and becomes more weather- and traffic-resistant during this period. After two years, the asphalt will be fully cured and achieve its optimum strength.

 

Tips on How to Cure Your Asphalt Driveway

The important thing is to be patient and follow the curing process correctly. Otherwise, you may end up with a driveway that cracks and crumbles. Here are a few tips on how to cure your asphalt driveway:

  1. If you let the driveway cure on its own, keep off foot and vehicle traffic for at least six months. It will give the asphalt time to harden and set.
  2. Refrain from applying any solvent-based seal coating for the first six months following paving is recommended. These sealants have the potential to seriously damage pavement by preventing the asphalt from properly curing.
  3. Be patient! Don’t be tempted to use the driveway before it is completely cured. It will only cause problems down the road.

By following these simple tips, you can ensure that your asphalt driveway will be long-lasting and durable. So take your time, and cure your driveway correctly!

 

Conclusion

Although asphalt is durable, it’s essential to protect the pavement while it cures. Avoid using the pavement too soon after the asphalt has been laid because this can harm the pavement and cause the curing process to take longer.

Ask A-Rock Asphalt any questions you may have regarding the curing procedure. We may offer suggestions on caring for your freshly laid asphalt surface.

For your upcoming asphalt paving project in Salt Lake City, UT, get in touch with A-Rock Asphalt! We have more than 25 years of expertise as a top asphalt paving contractor in California. We are experts in paving asphalt for residential and commercial projects. To schedule a free consultation, contact A-Rock Asphalt right away. We will be delighted to assist you with your next Salt Lake City, UT project.

Leave a Comment

Get a Free Quote Today!

Contact us by giving us a call at 801-973-9200 or by filling out our form! We can’t wait to hear from you

We serve the greater Wasatch front and Summit County

CONTACT

Scroll to Top